Underpass Bridge Repairs
Posted on
When the engineer from Campbell's of Doune inspected the bridge he found some wastage to one of the weight bearing girders. This has now been repaired following the bridge being shot blasted, by reinforcing steel plates being bolted to the gitder. The bridge will now be sprayed with epoxy resin and then the track will be layed across it. Walkways will be provided using 5cm GRP gratings (these are NOT for public use).






